Welcome! My name is Kaushik Agastyaraju and I recently completed analyis on a dataset of power outages. The following will be an explanation of my processes and analysis.
This project was meant to investigate a dataset of major power outages in the U.S. that took place from January 2000 to July 2016. These power outages, as defined by the Department of Energy, were included in the dataset if they impacted at least 50,000 customers or caused an unplanned energy demand loss of at least 300 megawatts. The dataset includes many features of data including: geographical, climatic, economic, and land-use data about the states affected. And by conducting open ended analysis I attempted to uncover a very small subset of the trends buried within this dataset.
Uplpading and understanding the data was the first step in this process. I downloaded the data from Purdue University’s Laboratory for Advancing Sustainable Critical Infrastructure, at https://engineering.purdue.edu/LASCI/research-data/outages.
From there I took steps to clean the dataset which would then allow me to perform exploratory data analysis, first through varaible analsysis, then through variable missingness and finally through statistical testing. After loading in the data and observing the features of power outages I decided on my main research question for this analysis:
The primary question explored is: What are the key factors influencing outage duration and its severity, and how can we predict the cause of an outage?
Understanding how long power outages last is essential for helping communities recover and build resilience. The length of an outage doesn’t just show how severe the issue was—it also reveals how quickly and efficiently power is restored. Longer outages can have ripple effects, disrupting vital services like healthcare and communication, impacting local economies, and even putting public safety at risk. By examining what causes these delays, energy companies can uncover key challenges, such as aging infrastructure, delays in deploying repair teams, or the sheer size of the incident. This understanding can guide better planning, ensuring resources are in place to respond faster and reduce the impact on everyday life.
The dataset contains 1534 rows and focuses on the following relevant columns for analysis:
| Column | Description | Data Type |
|---|---|---|
YEAR |
Year when the outage occurred | Integer |
MONTH |
Month when the outage occurred | Integer |
U.S._STATE |
State where the outage occurred | String |
NERC.REGION |
North American Electric Reliability Corporation (NERC) region involved in the outage | String |
CLIMATE.REGION |
U.S. Climate regions as specified by the National Centers for Environmental Information | String |
ANOMALY.LEVEL |
Oceanic El Niño/La Niña (ONI) index for the cold and warm episodes by season | Float |
CLIMATE.CATEGORY |
Classification of the climate episode as “Warm,” “Cold,” or “Normal” based on ONI threshold | String |
OUTAGE.START.DATE |
Day of the year when the outage started | Date |
OUTAGE.START.TIME |
Time of day when the outage started | Time |
OUTAGE.RESTORATION.DATE |
Day of the year when power was restored | Date |
OUTAGE.RESTORATION.TIME |
Time of day when power was restored | Time |
OUTAGE.DURATION |
Duration of the outage (in minutes) | Integer/Float |
CAUSE.CATEGORY |
Broad category of the cause of the outage | String |
CAUSE.CATEGORY.DETAIL |
Detailed description of the specific cause of the outage | String |
HURRICANE.NAMES |
Name of the hurricane (if the outage was hurricane-related) | String (Nullable) |
DEMAND.LOSS.MW |
Amount of peak demand lost during the outage (in megawatts) | Float |
CUSTOMERS.AFFECTED |
Number of customers affected by the outage | Integer |
POPULATION |
Population in the state where the outage occurred | Integer |
POPPCT_URBAN |
Percentage of the state’s population living in urban areas | Float |
POPDEN_URBAN |
Population density of urban areas (persons per square mile) | Float |
POPDEN_RURAL |
Population density of rural areas (persons per square mile) | Float |
TOTAL.PRICE |
Average monthly electricity price in the state (cents/kilowatt-hour) | Float |
RES.PRICE |
Monthly electricity price in the residential sector (cents/kilowatt-hour) | Float |
TOTAL.SALES |
Total electricity consumption in the state (megawatt-hour) | Float |
RES.SALES |
Electricity consumption in the residential sector (megawatt-hour) | Float |
IND.SALES |
Electricity consumption in the industrial sector (megawatt-hour) | Float |
This selection of columns ensures focus on essential data for understanding and analyzing power outages, their duration, and their impacts across the U.S.
The dataset was cleaned using the following steps:
OUTAGE.START.DATE and OUTAGE.START.TIME into a single column. Similarly, combined restoration date and time.OUTAGE.DURATION, CUSTOMERS.AFFECTED, and DEMAND.LOSS.MW were replaced with NaN since these represent missing data.Exploratory data analysis of the outages dataset allowed me to better understand the data I was working with: Understand the features and thier relations. These steps would allow me to stage more complex missingness and modeling questions later in the project
My univariatne analysis began with looking at the distribution of outages durations to understand the frequency of outage durations in the dataset
From there I looked at the distribution of customers affected. This was to understand the frequency of customers affected for each otuages across the dataset
I believe the ‘CAUSE.CATEGORY.DETAIL’ column might be NMAR (Not Missing At Random). The missingness in this column could be due to utility companies not fully investigating or reporting detailed causes for certain outages. For instance, an outage categorized as “equipment failure” might not have the specific specific details if the issue had many overlapping problems or if the investigation was left incomplete. The resources to investigate power outages may not be worth it when this is a continous occurence.
To potentially make this missingness MAR (Missing At Random), additional data about the reporting protocols used by utilities or the resources allocated to post-outage investigations would be useful.
Analyzing the dependency of missing values in the duration column provides valuable insights for better data imputation strategies. These dependencies can help identify patterns or relationships that contribute to missing data, enabling more informed and accurate imputation methods.
To better understand the missingness dependecy of the duration column I will test with cause category and customers affected.
The first step in missingness dependecy is to look at the distribution of cause category given the missingness of duration. similiarites in these bars may indiicate a dependency.
Null Hypothesis: The distribution of cause category is the same when Duration is missing vs not missing
Alternate Hypothesis: The distribution of cause category is the different when Duration is missing vs not missing
OUTAGE.DURATION liekley depends on CAUSE.CATEGORY.Customers Affected
Here we look at a violin plot showing the distribution of Customers Affected given the missingness of duration.
Null Hypothesis: The distribution of customers affected is the same when Duration is missing vs not missing
Alternate Hypothesis: The distribution of customers affected is different when Duration is missing vs not missing
For this section I will be testing whetere outage duration differs between low and high residiantial price areas.
Since the p-value 0.1970 is greater than 0.05, I fail to reject the null hypothesis. There isn’t enough evidence to conclude that outage durations differ significantly between low and high residential electricity price areas. The observed difference could simply be due to random chance.
Below is a histogram showing the empirical distribution of permutation differences. The dashed red line represents the observed difference.
For this project, I am creating a regression model where the goal is to predict the duration of power outages (OUTAGE.DURATION). I chose outage duration as the response variable because it is critical for understanding the severity of outages, improving preparedness, and allowing improved resource allocation for restoration efforts.
At the time of prediction, I assume we would know features like the number of customers affected (CUSTOMERS.AFFECTED) and the cause of the outage (CAUSE.CATEGORY). These are reasonable inputs because they are typically available shortly after an outage begins or is reported.
To evaluate the performance of the regression model, I am using Mean Absolute Error (MAE) as the evaluation metric. I chose MAE because it provides a clear measure of prediction accuracy by quantifying the average difference between predicted and actual durations in minutes. Unlike metrics such as Mean Squared Error, MAE is less sensitive to outliers, making it a practical choice for understanding average model performance.
By focusing on these features and using MAE, I aim to create a model that is both interpretable and effective for predicting outage durations in real-world scenarios.
For my baseline model, I aimed to predict outage duration (OUTAGE.DURATION) using two features:
CUSTOMERS.AFFECTED) - QuantitativeCAUSE.CATEGORY) - NominalPredicting outage duration is crucial for efficient resource allocation, minimizing disruptions, and helping communities and utilities better prepare for and respond to power outages.
CUSTOMERS.AFFECTED as-is since it’s a numeric column.CAUSE.CATEGORY to handle its categorical nature.I used a Linear Regression model. To preprocess the data:
I split the dataset into training (80%) and test (20%) sets to evaluate the model.
The Mean Absolute Error (MAE) on the test set was X.XX minutes. This metric indicates the average difference between the actual and predicted outage durations.
This baseline model is simple and gives a starting point for further improvements. While the MAE provides some insight into the model’s accuracy, I believe it could be improved by incorporating additional features (e.g., climate data, residential electricity prices) or trying a more sophisticated model.
For my final model, I implemented a search algorithm to determine the best combination of features for predicting outage duration (OUTAGE.DURATION). The model evaluated different subsets of features based on their performance, and measured their performance based on Mean Absolute Error (MAE).
The features selected by this process are:
DEMAND.LOSS.MWCUSTOMERS.AFFECTEDPOPDEN_URBANTOTAL.PRICEU.S._STATECAUSE.CATEGORYI used Linear Regression as the modeling algorithm, integrated within a preprocessing pipeline:
StandardScaler.OneHotEncoder, with support for unknown categories.missing) this would make sure that missing values again wouldn’t affect the model perforamceThe pipeline was tested on various combinations of features, using a loop to evaluate their performance. This approach allowed an unbiased feature selection process based on the data and MAE
DEMAND.LOSS.MW, CUSTOMERS.AFFECTED, POPDEN_URBAN, TOTAL.PRICE, U.S._STATE, CAUSE.CATEGORYCUSTOMERS.AFFECTED, CAUSE.CATEGORYThe final model improved upon the baseline by reducing the prediction error by approximately 400 minutes.
By automating feature selection, I allowed the data to guide the process of building a better model. The final feature set effectively captures the factors influencing outage duration, leading to a more accurate and actionable prediction model.
For the fairness analysis, I compared two groups: highly affected outages (with customers affected above the median) and lowly affected outages (with customers affected at or below the median). These groups were chosen to investigate if the model performs differently based on the number of customers affected.
I used Mean Absolute Error (MAE) as the evaluation metric because it quantifies the average prediction error in a straightforward and interpretable way. This is ideal for understanding prediction accuracy across the two groups.
The test statistic used was the difference in MAE between the two groups. I set the significance level ((\alpha)) to 0.05.
Since the p-value is less than the significance level alpha = 0.05, I reject the null hypothesis. This indicates that the model’s performance differs significantly between highly and lowly affected groups, suggesting potential unfairness.